Retention cradle for irrigation | Castelfondo (Tn) | start of work: 2015 - nearing completion
Construction of a reservoir for restraint for irrigation, complete with ancillary works and water connections in loc. Ronchi of the Municipality of Castelfondo. Obtained by excavation on a weak slope reshaped with the introduction of a dam in earth with reinforced concrete core, it has a maximum flooded volume of 129,894 cubic meters and a maximum water height of 12.40 m. The overall development of the reinforced concrete core is 420 m. The water for the filling reaches the basin through a polyethylene pipe with a diameter of 450 mm, 9 km long, starting from the intake works to the cylindrical tank from which the irrigation network starts.
Slide title
Scrivi qui la tua didascalia
Button
Slide title
Scrivi qui la tua didascalia
Button
Slide title
Scrivi qui la tua didascalia
Button
Slide title
Scrivi qui la tua didascalia
Button
Residential construction
Private Building | Romallo |
start of work: 2018 - in progress
New low energy consumption residential building (class A according to PAT Trento protocol). Supporting structure in XLAM wood, mineral wool coat, insulation covering in wood fiber. Low temperature heating system with air-water heat pump, controlled mechanical ventilation, home automation system. Made above a basement volume in reinforced concrete.
Slide title
Scrivi qui la tua didascalia
Button
Slide title
Scrivi qui la tua didascalia
Button
Slide title
Scrivi qui la tua didascalia
Button
Slide title
Scrivi qui la tua didascalia
Button
Slide title
Scrivi qui la tua didascalia
Button
Industrial construction
Construction of a new agro-industrial complex for the conservation and processing of fruit (apples). The area of intervention is a total of 40,000 square meters while the complex is spread over 20,000 square meters. The building has a metal supporting structure with sandwich panel infills, also used for cell formation. There are facilities of:
Refrigeration: working with ammonia with indirect expansion with refrigerating fluid in glycol water that allows the cooling of the fruit up to 0 ° C;
Controlled atmosphere: system that allows to change the concentration of air by lowering the quantity of oxygen to "block" the ripening of the fruit;
Heating: there are two heating plants (one for the office area and one for the processing area) running on natural gas for a total power of 350kW, with mixed heating systems (floor, fan convectors, radiant panels);
Summer office cooling: with a special freon machine using the same heating systems (fan convectors, floor);
Fire-fighting: construction of a storage tank for exclusive fire-fighting use with two different systems operating thanks to two pressurization groups, sprinkler systems inside the building and hydrant and external monitors.